Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1 Year
Manufacturer/Factory, Trading Company
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

In-stock Capacity
The supplier has In-stock capacity
Full Customization
The supplier provides full customization services
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (18)
  • Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine
  • Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine
  • Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine
  • Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine
  • Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine
  • Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine
Find Similar Products

Basic Info.

Model NO.
HFT-1
Product Object
Infant
Designed Speed
>400pcs/min
Production Speed
>400pcs/min
Computer Control Panel
Computer Control Panel
Product Specification
Small
Automatic Grade
Full Automatic
Certification
CE
Condition
New
Approved Before Shipping
Machine Will Be Tested and Approved in Seller′s Fa
Transport Package
Wooden Case
Specification
SLML
Trademark
PKLD
Origin
China

Product Description

Full Servo Big Waistband Baby Diaper MachineBaby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine
1.Main technical Parameters
1 Design speed 600pcs/min
2 Working speed 450-500pcs/min
3 Qualified rate ≥ 97%
(exclude the wastage due to the glue applicators and materials splicing joint)
4 efficiency ≥ 85%
5 installation capacity 360KW
7 Electricity 380V ±5%,50HZ
8 Wire Three phases four wires 380V/50Hz  (ground wire)
9 Lowest pressure 0.6Mpa
10 Total weight 60tons
11 Machine size 38×8×4.5 M(L×W×H)
12 Working space 42×11×6 M (L×W×H)
13 Machine color Metal beach yellow+ sky blue can be changed by order
14 Product size 3sizes
 
15 Containers 6X40HQ

Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine
2.Machine main parts brand:
  Name Brand Origin
1 Servo motor Mitsubishi
 
Japan
2 Auto web guider Senming China
3 Touchable screen Banner USA
4 PLC controlling system Mitsubishi
 
Japan
5 Sensor Banner USA
6 Safety production Schneide Germany
7 Glue applicator ITW or Nordson USA
8 Cutter raw material T15 USA
9 Gear (according to usage) HRB/BEM/NSK China/Germany/Japan/Sweden
10 Timing belt Optibelt  Germany/USA
11 Low voltage electronic Schneide France
12 Electrical connection terminal Phoenix Germany
13 Temperature controlling system Omron Japan
14 High-speed joint SMC Japan
15 Pressure regulating valve Airtac Chinese Taiwan
16 Pneumatic element Airtac Chinese Taiwan
17 Solenoid valve Airtac Chinese Taiwan
18 Moisture separator Airtac Chinese Taiwan
19 Automatic fault alarm Mitsubishi Japan
20 Planetary reducer APEX Chinese Taiwan
21 Liner guide rail Hiwin Chinese Taiwan

Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine
3.Spare parts list:
Name Quantity Name Quantity
Kit 1 set fuse 10 pcs
Manually packing machine 1 set transition wheel 3 sets
Cutting blade 2 pcs Timing belt 3 pcs
Truncation blade 1 set Conveying belt 2 pcs
thermocouple 2 pcs Electric heater 5 pcs
Electrical schematic diagram 1 back transmission diagram in PDF 1
instruction of main electrical elements 1 machine layout in PDF 1


Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making MachineDelivery place:Xiamen Port.
Delivery Time
The machine shall be ready within 180 working days after the Seller receives the deposit and the sample drawings have been confirmed by both parties.
The Seller shall inform the Buyer of the machine completion in written form by fax or by email.

Payment term:
Machinery:
The Buyer shall pay the Seller 30% of the total contact amount by TT payment within 14 days from the date the contract is signed. The machine shall be loaded within 3 working days after the Seller receives the rest 70% by TT before shipping.
Note: If Buyer cannot pay the deposit by the specified date as required above, the Seller has the right to re-price the machine.
Raw materials:
The Buyer shall pay the Seller 50% of the total contact amount by TT payment within 14 days from the date the contract is signed. The raw materials shall be loaded within 3 working days after the Seller receives the rest 50% by TT before shipping.

Approved before shipping:
Machine will be tested and approved in seller's factory before delivery. The time for testing in seller's factory will not be more than 15 minutes. Raw materials consumption within 15 minutes will be afforded by seller. If customer needs more time for testing, the cost will be afforded by customer
The wastage excludes the circumstances when glue applicator breaks down or exchange material.

Quality guarantee period and wage:
The Seller offers a 12-month quality guarantee period from the delivery date. During this period, the Seller shall repair the machine and provide repair parts (wearing parts, and parts subject to normal wear and tear (like: cutters and belts, etc)or damage attributable to the Buyer excluded). The damage attributable to the Buyer shall be repaired at the Buyer's cost.

Installation and Testing:  
1: The Seller will send engineers for the first installation and adjustment of the machine sold. Erection Period: within__30__ days
2: Installation and adjustment abroad: The Buyer shall pay for the transportation, accommodation (room and board) and translation if it requires the Seller to offer after-sales services like installation, adjustment, training workers, and machine maintenance abroad. The accommodation offered by the Seller shall be of three-star standard of China's Hotel at least.
Store Condition:
Factory-set-up should meet these demands:
1: Without vibration, clean and clear environment, good ventilation, no flammable and explosive and corrosive substances around.
2: Flat concrete ground, concrete number should be at least 300#; ground level difference should be within 15-25mm, so that machine adjustment is more convenient.
3: Ground should have enough bearing capacity. Concrete ground thickness is no less than 200mm. if machine is put on the 2nd floor, concrete floor(reinforced concrete pouring) average bearing capacity is at least 3.5tons/sm. machine is put no more than on the 2nd floor.
4: To keep at least 1 meter distance between the back side of machine (including attached equipment) and the walls.
5: To prevent the accident due to the uneven ground.
6: The inside temperature in the factory is no less than 12-15ºC.

Raw materials store should meet these demands.
1: Tray shelves are needed to put at the bottom of raw materials in case of damp and moisture.
2: Clean and clear environment, sealed and closed, no mosquito, no flammable and explosive and corrosive substances around.
3: To keep normal temp. 15-30 ºC inside the store is ok. 
Material style
roller  pulp 685g/m2
hydrophilic  non-woven as top sheet 18g/ m2
SMS leak cuff nonwoven 15g/ m2
top sheet tissue paper virgin tissue 15g/ m2
bottom sheet tissue paper virgin tissue 15g/ m2
back sheet PE film 24g/ m2
Frontal tape    23u/m2
Side tape  
leak cuff and leak cuff elastic ribbon 720D
Waistband tension film  
SAP  
hot melt adhesive -elastic  
hot melt adhesive- construction  

Baby Pampers Diaper Bagging Packing Packaging Filling Sealing Making Machine


















 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier